Water Test Facility Upgrade
Project Details:
Total Value: $200 000
Year Completed: 2017
Duration: 2 months
Background:
The existing water test facility in Rosslyn required an upgrade to ensure all vehicle wheels remained on the conveyor during testing. This modification was necessary to accommodate future vehicle models within the facility.
Description:
The upgrade involved removing the drive and take-up components of the existing single-wheel conveyor. The drive-end pit was widened to accommodate a longer drive unit for a dual-chain conveyor system, and a second conveyor trench was constructed.