Under body Conveyor

Project Details:

Total Value:     $40 000
Year Completed:    2017
Duration:     3 months

Background:

An additional conveyor, installed parallel to the existing conveyor, was required to enhance holding capacity during body fabrication.

Description:

The conveyor sections were designed, manufactured, and installed.