Water Test Facility Waste Water Transfer

Project Details:

Total Value:     $165 000
Year Completed:    2023
Duration:     6 months

Background:       

There was a requirement to transfer the waste water from the water test facility to the effluent plant at the paintshop.

Description:        

A pipe route through the production facility was planned and the hydraulic design done.   A 50mm galvanised pipeline was installed over a distance of approximately 0.5 km.  Two pumps with bag filters were installed operating on a standby and duty pump principle.